Our Projects

Discover some of our engineering and technical projects.

Batching Control System Upgrade for Manaseer Sweileh Mixing Plant

Category: Cement

Client: Al-Manaseer Industrial Complex

This project involved upgrading of the legacy, proprietary LIEBHERR batching control system at the Sweileh mixing plant with a modern, …

AlFayhaa Cement Plant Electrical and Automation Installation and Commissioning Work for 20tph White Cement Mobile Grinder Station

Category: Cement

Client: North Region Cement Co. (NRCC),

...

KAR-QARACHOG Adding Additional 200TPH Vertical Cement Mill to the DCS Project (PCS7 V9.1)

Category: Cement

Client: KAR Cement Qarachogh Cement Plant

...

Jana Plant Commissioning & Startup

Category: Cement

Client: Al-Manaseer Industrial Complex

...

Kiln4 Upgrading of SIEMENS PCS7 CEMAT Control System from V6.1 to V9.1

Category: Cement

Client: AlSabeh Cement Plant

...

NRCC PCS7 Upgrading from PCS7 V7.1 to PCS7 V9.0 + CEMAT V9

Category: Cement

Client: North Region Cement Co (NRCC)

Upgrading the existing PCS& V7.1 +CEMAT V6 to PCS7 V9.0 + CEMAT V9, the project include implementation of the new …

Off-shore Drilling Rig Monitoring System

Category: Oil & Gas

Client: National Petroleum Co. (NPC)

Supply, installation and commissioning of off-shore drilling rig monitoring system and instrumentation, the project was done in Al-Risha.

Kirkuk Refinery Unit 105 and 107 Design, Supply, Install and Commissioning for New DCS system

Category: Oil & Gas

Client: North Refinery Company

The project involved upgrading two units (unit 105 and 107) in Kirkuk Refinery from an obsolete analog control scheme to …

Procurement of SCADA Software Complete System for Mosul

Category: Water

Client: International Committee of the Red Cross (ICRC)

This project involved complete SCADA system for the Water Directorate of Mosul (DOW). The system is built on a Server/Client …

Subba Water Treatment Plant Programming and Commissioning of PLC Control System and field instrumentation

Category: Water

Client: State Company for Oil Projects (SCOP)

...

Kubaisa Cement Plant (Phase 2) Two Clinker Production Lines Control system

Category: Cement

Client: Kubaisa Cement Plant

Installation and commissioning for new PLC/SCADA system based of SIEMENS TIA V15.1 Professional for two lines using redundant S7-1500R PLC.

Rashadiya Cement Plant Remote IO Panels Upgrading

Category: Cement

Client: Lafarge Holcim

Upgrading Kiln line 2 remote IO panels which includes replacing the old GE remote IOs with SIEMENS ET200M.

Umm Qasr New Control System for Two Cement Mills and Utilities

Category: Cement

Client: Umm Qasr Cement Plant

Design, Supply, installation and commissioning for two cement mills and utilities system, the system was WINCC (TIA)/S7-1500.

Kubaisa Cement Plant New Control System for Cement Mills and Clinker Transport

Category: Cement

Client: Kubaisa Cement Plant

Design and commissioning of a new control system for cement mills and clinker transport using Siemens S7-1500 and WinCC (TIA).

QNCC New 6000TPD Cement production Line (Line 5)

Category: Cement

Client: Qatar National Cement Company (QNCC)

Electrical installation services for industrial facilities, Qatar National Cement Line #5, the main contractor is Fives FCB and our company …

JPMC Eshidiya Mines Upgrading PLC/SCADA system from Siemens S5 to S7 for Beneficiation Plant, Blending and Wet Storage Yard

Category: Mining

Client: Jordan Phosphate Mines Co. (JPMC)

Upgrading of the old obsolete S5 PLC system to S7 TIA for the washing and flotation plant. The project include …

PLCs Communication in FSA, Stackers, and Yokogawa DCS in JIFCO Plant at Eshidiya

Category: Mining

Client: Jordan Indian Fertilizers Co. (JIFCO)

Jordan Indian Fertilizers Co. (JIFCO), PLCs Communication in FSA, Stackers, and Yokogawa DCS in JIFCO Plant at Eshidiya Jordan, 2023

JIFCO Redundant PLC (1500R) Upgrade for FSA, Stacker A & B Plants

Category: Mining

Client: Jordan Indian Fertilizers Co. (JIFCO)

Jordan Indian Fertilizers Co. (JIFCO), Redundant PLC (1500R) Upgrade for FSA, Stacker A & B Plants - Jordan, 2023

JPMC Abyad Mine Rehabilitation and Upgrade of Control and Electrical System from Classic Control to PLC/SCADA System

Category: Mining

Client: Jordan Phosphate Mines Co. (JPMC)

The Jordan Phosphate Al-Abyad Mine used to operate on a legacy classical control system that lacked modern automation and data …

Al-Sabeh Cement Upgrading of Automation System from SIMATIC S5 to S7 for PLCs 1-5 and Burner PLC

Category: Cement

Client: Cimenterie Nationale - AlSabeh Cement Plant

PLCs 1-5 and Burner PLC at Kiln4 were from the previous-generation SIMATIC S5 system which is obsolete. This project involved …

Programming and commissioning of two phosphate flotation plant based on S7-400 PLC and WinCC SCADA system.

Category: Mining

Client: Jordan Phosphate Mines Co. (JPMC)

...

Arab Potash New PLC/SCADA system based on new SIEMENS PLC S7-1500 and TIA software, the PLC is communicating with intelligent LV and MV MCC panels

Category: Mining

Client: Arab Potash Co.

New PLC/SCADA system based on new SIEMENS PLC S7-1500 and TIA software, the PLC is communicating with intelligent LV and …

JIFCO Design and commissioning of new SCADA system for two ball mills

Category: Mining

Client: Jordan Indian Fertilizers Co. (JIFCO)

Design, supply, installation and commissioning of new SCADA system for two ball mills, the system was SIEMENS S7-400H and WinCC.